License tests of the electronic component base of the domestic and foreign manufacture carried out by the Test Laboratory of the Department of Tests, Metrology, and Certification of FRPC JSC “RPA “Mars”

1. Test program and procedures development cost and the tool set development and production cost start from 70,000 rubles (for an electronic component base of foreign manufacture per one item or per one item group with the same exposure factor pattern).

2. 100% acceptance checkout of the electronic component base of foreign manufacture.

Testing TypeTest periodCost,Rouble
Product Identification0,06 working day for one element836
Appearance Test, incl. Marking Quality Test0.05 working day for one element702
Weight Testing, Overall,
Installation, and Mounting Dimensions Test,
0.06 working day for one measurement902
Parametric Functional Testing under Good Environmental Conditions0.06 working day for one measurement785

3. Certification Tests of an Electronic Component Base of the Foreign Manufacture.

Test NameTest PeriodCost of Testing, Rouble
Critical Frequency Test2.6 working day34 606
Test for Examination the Critical Frequency Failure in Specified Band 2.6 working day34 606
Stability Test under the Influence of Sinusoidal or Broadband Random Vibration (Vibration Test) 2.5 working day33 637
Strength Test under the Influence of Sinusoidal or Broadband Random Vibration long term (Vibration Survival Test long term)3.3 working days44 310
Strength Test under the Influence of Sinusoidal Vibration short term (Vibration Survival Test short term)2.5 working day34 539
Strength Test under the Influence of Plural Mechanical Shock (Bumping Test))2.6 working day34 790
Stability Test under the Influence of Plural Mechanical Shock (Shock Stability Test)2.48 working day33 136
Test for Single Mechanical Shock (Impact Test)2.42 working day32 335
Test for Sinusoidal Vibration with Increased Amplitude Acceleration 2.43 working day 32 335
Test for the Higher Ambient Operating Temperature Effect2.43 working day32 535
Test for the Higher Ambient Limiting Temperature Effect 2.39 working day32 051
Test for the Lower Ambient Operating Temperature Effect 2.46 working day32 755
Test for the Lower Ambient Limiting Temperature Effect 2.39 working day 31 936
Test for Changes in the Ambient Temperature 2.47 days (24-hour working period)32 840
Test for Atmospheric Condensation (hoarfrost, dew)2.39 working day 31 936
Test for Higher Air Humidity, long term 9.24 days 114 854
Test for Higher Air Humidity, accelerated4.8 days (24-hour working period)62 018
Test for Higher Air Humidity, short term 3.6 days 46 651
Test for Decreased Atmosphere Pressure 2.37 days (24-hour working period)31 635
Test for Increased Atmosphere Pressure 2.37 days 31 635
Solar Radiation Test 5.36 days (24-hour working period)67 647
Brine Atomizing Test4.46 days (24-hour working period)56 798
Test for Atmospheric Fallout (rain)2.38 working day31 786
Solderability Test 2.31 working day for one test30 915
Hear resistance test during the soldering2.31 working day for one test30 915
Conformance Inspection for Overall, installation, and Mounting Dimensions 0.06 working day for one measurement902
Appearance Test0.06 working day702
Weight Test0.06 working day for one measurement902
Internal Visual Examination0.06 working day902
Marking Quality Test 0.06 working day902
Strength Test for Package 2.67 working day35 325
Test for the Rocking Effect with Amplitude of ±45 deg (deviation angle) 2.37 working day31 581
Test for Short-term and Continuous Slopes 2.37 working day31 581